A stone long-house that steps down with the field.

Alder House

Architecture

 · 

Residential

  ·  

Cotswolds, United Kingdom

  ·  

Completed

 

2023

A stone long-house that steps down the field instead of levelling it.

The family wanted a house that felt like it had always been in the valley. The plan is one long range of rooms that follows the slope, half a level at a time.

Each step down opens a little more to the view. The house begins enclosed at the lane and ends in a glazed room at the bottom of the field.

Client

Private client

Location

Cotswolds, United Kingdom

Year

2023

Scope

New-build house

Area

410 m²

Status

Completed

Collaborators

Berg & Reid, structure

Photography

Anna Lowe

White villa with a pool framed by palms and shrubs

THE SITE

Letting the land set the levels.

We surveyed the field by hand before drawing anything. The four floor levels match the natural terraces, so almost no earth left the site.

The dry-stone walls along the boundary became the house walls. They were rebuilt with the same local stone, laid the same way.

Timber-clad two-storey house with a dark fence and driveway

“It feels like the field made room for us.”

Homeowner — Alder House

Three materials drawn from within a few miles.

Timber-clad two-storey house with a dark fence

Stone

Cotswold limestone, dry-laid

The external walls use stone from a quarry eight miles away.

Low living room with a ribbon window and leather ottomans

Timber

Green oak frame

Visible inside, pegged rather than bolted, and left to season in place.

Symmetrical living room with a white sofa and blue cushions

Plaster

Lime, hand-troweled

Inside the stone walls, so the house can breathe through the seasons.

Dark timber house with a large tree and glowing interior at dusk
Neutral living room with a sectional sofa and wall clock

PROCESS

Sketch to site.

01

Sketch

A hand survey of the field and its terraces.

02

Plan

Four floor levels, each following the ground.

03

Render

Stone and oak samples tested on site.

04

Built

Built by local trades over eighteen months.